Hi
As I forget the camera all the time, I dont have much to show but this time our national television did it for me so...
http://www.youtube.com/watch?v=8rv6E...layer_embedded
http://www.youtube.com/watch?feature...q1aScTA#at=107
So as it was Live show the setup time was about 2-3 minutes. Used 1x2w RGB and 2x1w RGB
I think you get the flicker. It was really nice in TV.
All the Lightning was also done by me and my coworkers.
12 Robe MMX Spot
8 Robe MMX Beam
40 Robe 100 Led Beam
12 Robe 300 Led Wash
20 10 channel blinders
about 150m of RGB Led strips
Winner is here http://www.youtube.com/watch?v=7-c1WKAoMFw
And one pretty funny setup that took the most of the time.
http://www.youtube.com/watch?v=2dllo85ZSUk
Priit