Page 2 of 2 FirstFirst 12
Results 11 to 13 of 13

Thread: Power supply for a scanset.

  1. #11
    Join Date
    Oct 2007
    Location
    Sydney, Australia
    Posts
    156

    Default

    Doesnt that mob (with the switcher) take forever to ship? Not that it matters - I could order it - I'm far from finishing my projector - as I still need 2 lasers, a quick show and some bounce mirrors / adjustable mounts.

    The only saving with that psu is weight. The ring transformer is the same dimensions, give or take 10mm. I'll go with it because it is local, weight is of no concern, and I can document it here for others to copy so there are further options for projector builders to use

  2. #12
    Join Date
    Dec 2008
    Location
    veenwouden
    Posts
    2,580

    Default

    4 weeks shipment is fine. A metalshop takes usually 4 till 5 weeks and an optic supplier takes up til 8 weeks or sometimes even more. If you order just order 4 for other projects as well.


    Interested in 6-12W RGB projectors with low divergence? Contact me by PM!

  3. #13
    Join Date
    Oct 2007
    Location
    Sydney, Australia
    Posts
    156

    Default

    2.5 weeks max for an off the shelf component like a power supply. 4-8 weeks is understandable for a built to order component, but 4-8 weeks for an off the shelf part is over excessive.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •